İşveren | : | AYEN ENERJİ A.Ş. |
The feasibility studies of the Çaypınar RES project in the 24 MW installed power to be installed and operated in Balıkesir province have been completed and the pre-license has been got. Procedures for legal permission to start construction are in progress.